Skid Mounted Biogas Upgrading Unit 300 Nm3/h WWTP Sludge Digester O&M Package
| Upgrading Capacity: | 300 Nm3/h, Expandable To 1200 Nm3/h | Methane Purity: | 97% CH4, CO2 Below 2%, H2S Below 5 Ppm |
| Skid Footprint: | 40 Ft Containerised, 12 X 2.4 M | Upgrading Technology: | Hybrid PSA Plus Membrane Separation |
| Methane Recovery: | Above 98%, Slip Below 2% | Electrical Rating: | ATEX Rated Components |
| High Light: | Skid Mounted Biogas Upgrading Unit,Biogas Upgrading Unit 300 Nm3/h |
||
Sewage treatment plants and municipal sludge digesters often flare or burn raw biogas at low value because the gas quality fluctuates with sludge feed. This containerised upgrading skid converts 300 Nm3/h of raw biogas into pipeline grade biomethane above 97 percent methane, so the plant can inject into the local gas grid, sell bio CNG at the gate or feed a vehicle refuelling station. Plants with variable sludge quality gain the most, because control logic adjusts cycle time automatically to hold purity on spec.
Two purification stages run in series. The pressure swing adsorption stage strips bulk carbon dioxide, then hollow fibre membranes trim the remaining CO2 and nitrogen to grid specification. A dual bed dryer and an activated carbon guard bed sit upstream, so moisture and trace sulphur never reach the membranes. Because the skid is built on a single frame with all piping, valves and analysers pre assembled, site work is limited to inlet connection, power supply and gas outlet tie in.
Each unit is performance tested on a dedicated test bench before shipment, with methane recovery above 98 percent and methane slip below 2 percent verified by a calibrated analyser. The frame layout is designed for stepwise growth from 300 to 1200 Nm3/h, so an operator can add parallel membrane modules and a bigger compressor without rebuilding the skid or stopping production.
Owners of digesters rarely want to run a gas upgrading plant with their own maintenance team. Our service package covers preventive maintenance visits, quarterly membrane performance checks, analyser calibration, consumable and spare parts supply from a regional buffer stock, plus a remote SCADA dashboard where our engineers watch pressure curves, purity trends and compressor run hours. A 24 hour engineer response and an uptime commitment are written into the contract, and every project ships with reference cases from operating municipal plants that can be visited or verified before purchase. Each skid is delivered with ATEX rated electrical components, gas detection interlocks and flame arrestors, so the unit can pass local utility and environmental acceptance review without redesign.
Delivery is 90 to 120 days after drawing approval, with T/T, L/C or D/P accepted and one set minimum order quantity. Complete documentation, operator training and commissioning supervision are included.