Cold Climate Digester Heating Skid Unit With ATEX Zone Rated Safety Package
| Heating Load: | 180 KW Thermal At -25°C Ambient | Heat Exchanger: | Spiral Type, 316L Plates |
| Tank Insulation: | 100 Mm PIR With Aluminium Jacket | Gas Detection: | CH4 And H2S Dual Sensor, 8 Points |
| Safety Interlock: | PLC Based, SIL 2 Capable Logic | Ex Rating: | Zone 1 And Zone 2 Per ATEX Directive |
| High Light: | Cold Climate Digester Heating Skid Unit,ATEX Zone Digester Heating Skid Unit |
||
In cold climates a biogas plant fails in two ways: the digester loses temperature and gas yield collapses, or a gas leak goes undetected and the site is shut down by the authority. This package addresses both, because the heating retrofit and the safety upgrade are usually bought together during a winter reliability project.
- Rated heating load 180 kW thermal at minus 25 C ambient
- Spiral heat exchanger in 316L, tolerant of fibrous slurry and low fouling
- Digester wall and roof insulation at 100 mm PIR with aluminium jacketing
- Hot water loop fed from CHP jacket water, with a backup boiler tapping
- Temperature held within plus or minus 1 C of the mesophilic setpoint
Gas detection covers eight points across the digester roof, gas holder, blower room and CHP container, reading methane and hydrogen sulphide on the same sensor head. Detection triggers a staged response: alarm at 10 percent LEL, ventilation boost at 20 percent, and gas train isolation at 40 percent. All logic runs in a SIL 2 capable PLC with a hardwired override, and the panel is built for Zone 2 installation with Zone 1 field devices.
The skid is designed to bolt onto an operating plant. Pipework is pre-assembled and flanged so the tie-in window is measured in hours, not days, and the safety panel can be commissioned while the digester stays live. For plants with existing instrumentation, the panel accepts 4-20 mA signals from third-party sensors.
Delivery includes the ATEX zone drawing, sensor layout, cause and effect matrix, calibration certificates and a functional test report suitable for insurance and authority review. That documentation package is often the part clients cannot produce themselves during an audit.
Farm plants in northern Europe, Canada and northern China upgrading an under-insulated digester; municipal plants asked by the fire authority to add gas detection; and EPC contractors who want a certified safety package as a sub-scope.
Tell us your tank size, ambient design temperature and existing gas train, and we will size the heating load and detection points.