Grid Ready Biogas Desulfurization Package For CHP Power Plant Integration
| Outlet H2S: | Below 200 Ppm (5 Ppm Option) | Gas Flow: | 1,200 Nm3/h Raw Biogas |
| Turndown Ratio: | 40 Percent | Pressure Drop: | Under 3 KPa |
| Process: | Biological Scrubber With Iron Oxide Polishing | Grid Interface: | Protection Relay, Metering And Sync Panel |
| High Light: | Biogas Desulfurization Package,Grid Ready Biogas Desulfurization,CHP Biogas Desulfurization Equipment |
||
Most biogas plants lose weeks at the end of construction because the gas train and the grid interface were bought separately and do not talk to each other. This package is sold as one integrated block: gas cleaning sized for the CHP, plus the protection and metering panel the utility requires before it will allow export.
Gas Train- Design flow 1,200 Nm3/h raw biogas, turndown to 40 percent
- Biological scrubber removes the bulk of H2S at low operating cost
- Iron oxide polishing stage brings gas below 200 ppm for the engine, 5 ppm where upgrading follows
- Condensate traps and a knock out drum ahead of the media beds
- Pressure drop held under 3 kPa across the full train
The panel includes the protection relay set, synchronising relay, export metering and the interface terminals required by the grid operator. Settings are prepared against IEEE 1547 and the applicable local code, and the relay configuration file is handed over so the client can prove compliance during inspection. Where the local code requires a dedicated point of connection, we prepare the single line diagram and cable schedule for approval.
Handover DossierAcceptance of a feed-in tariff plant usually depends on paperwork as much as hardware. The dossier includes gas analysis reports before and after the train, protection relay test sheets, meter calibration certificates, cause and effect matrix and an operating log template. Clients use it directly for the utility application and for insurance.
Integration with Existing PlantThe package is commonly retrofitted into a plant that was built with a bare gas bag and a simple filter. Tie-in points are defined after a site survey so the shutdown window can be planned around the plant's maintenance schedule, typically one working day.
Operating CostBecause the biological stage carries most of the sulphur load, iron oxide consumption is modest, and the nutrient dosing requirement is low. Most plants report a media cost well below a pure dry desulfurization approach on the same gas volume.
Share your gas analysis and grid code reference, and we will confirm the train configuration and panel specification.