Biogas Purification Plant
Scalable Biogas Desulfurization And Purification Technologies For Easy Integration Into Existing Biogas Plants
Biogas desulfurization tank using high-activity iron oxide media achieves 95%–99% H₂S removal, cutting outlet to ≤50–100 ppm. Corrosion-resistant carbon steel, SS304/SS316 or FRP build, low pressure drop, easy media replacement. Skid-mounted or fixed, customizable for CHP engines, boilers and landfill gas projects.
Activated Carbon Siloxane VOC Removal System Vessel For Landfill Gas Purification Line
Activated carbon vessel removes >95% siloxane (D5) and >90% VOC from landfill gas, protecting engines. Features 6 bar design, 12-18 month media life, 8-hour changeout, and sulfur recovery port. Epoxy-lined carbon steel or SS316 for chloride sites; custom bed sizing available.
Turnkey Biomethane Upgrading Plant Delivering EN 16723 Grid Injection Compliance
Turnkey biomethane upgrading plant in pre-piped 40 ft HC containers, delivering 97–99% CH4 and >98% recovery with <1% methane slip. Compliant with EN 16723-1/-2 for grid injection. Includes design, installation, commissioning, and RNG certification data.