Turnkey Biomethane Upgrading Plant Delivering EN 16723 Grid Injection Compliance

Basic Properties
Place of Origin: Qingdao, China
Brand Name: Hanwei
Certification: ISO 9001
Trading Properties
Minimum Order Quantity: 1 Project
Price: Get Custom Quote
Payment Terms: T/T,D/P,L/C
Supply Ability: 2 Projects per Quarter
Specifications
Methane Purity: 97 To 99 Percent CH4 Methane Recovery: Above 98 Percent
Methane Slip: Below 1 Percent H2S Content: Below 5 Ppm
Turndown Ratio: 50 Percent Container Size: 40 Ft HC
High Light:

Turnkey Biomethane Upgrading Plant

,

Biomethane Upgrading Plant EN 16723

Product Description
Deliverable, Not Just Equipment

This offer is built around a single commitment: gas that meets the grid operator's specification on the day of handover. We size the upgrading train, supply it in container modules, supervise installation, run the commissioning programme and hand over a gas quality report against EN 16723-1 and EN 16723-2.

Technical Targets
  • Methane purity 97 to 99 percent, adjustable to the local grid limit
  • Methane recovery above 98 percent, methane slip held below 1 percent
  • H2S below 5 ppm and water dew point compliant at the injection pressure
  • Online analysis of CH4, CO2, O2, H2S and dew point, logged for reporting
  • Turndown to 50 percent for variable digester gas production
Scope of Supply

Process design and mass balance, desulfurization, dehydration, upgrading, compression interface, odorization interface, gas analysis shelter, PLC and SCADA, container modules, installation supervision, commissioning and operator training. Civil and electrical works can be included where a single point of responsibility is preferred.

Why Prefabrication Matters

Each module is pre-piped, pre-wired and factory tested, which turns months of site work into days of connection. For projects on tight permitting or funding deadlines this is often the difference between commissioning this season and next.

Carbon and Commercial Value

Biomethane injected into the grid displaces fossil gas, and the documented methane slip figure supports a clean carbon balance for RNG certification. We provide the operating data package that auditors ask for: gas volumes, methane content, slip measurement method and calibration certificates.

Project Path

We start with the gas analysis and grid specification, issue a process scheme for approval, then lock the container layout and delivery schedule. Typical duration from contract to handover is five to seven months depending on permitting.

After Handover

Handover is not the end of our involvement. The first year includes two remote reviews of operating data, membrane or carbon performance checks, and a spares stocking recommendation based on measured consumption. Where the client operates several sites, we can standardise the control interface so one control room supervises them all, which reduces the training burden and makes benchmarking between plants straightforward.

Send us your gas analysis and grid entry specification, and we will return a compliance plan with a fixed scope and timeline.