Bolted Steel Anaerobic Digester Tank 1500m3 Poultry Litter Biogas Plant GFS
| Digester Volume: | 1500 M3 | Process Temperature: | Mesophilic 37 C |
| Hydraulic Retention Time: | 25-30 Days | Coating Thickness: | 12 Mm |
| Daily Manure Capacity: | 20-60 Tons | Working Volume Range: | 500-5000 M3 |
| High Light: | Anaerobic Digester Tank 1500m3,Bolted Steel Anaerobic Digester Tank,GFS Biogas Plant Tank |
||
This 1500 m3 bolted steel anaerobic digester is built for poultry litter and mixed livestock manure biogas plants that must keep gas output stable across the whole year. Glass fused to steel panels are coated in the factory before shipment, so the tank resists hydrogen sulphide attack and slurry abrasion over a 25 year service life, while on site assembly is finished in weeks instead of months. The unit is aimed at farms and agro industrial estates that generate 20 to 60 tons of manure per day and need a proven, repeatable plant rather than a one off experiment.
Every panel is punched, coated with a 12 mm glass fused layer on both faces and bolted with hot dip galvanized hardware. No field welding is required, which removes the need for certified welders on remote farms, avoids weld corrosion failures and lets the plant start biological commissioning far earlier than a welded concrete or stainless tank. If the herd grows, additional ring courses are bolted on without draining the digester.
A dedicated aerobic scrubber tower removes H2S before the gas reaches the blower, CHP unit or gas holder. Sulfur oxidizing bacteria are cultivated on structured packing, so the running cost is limited to a small air blower and periodic nutrient dosing. A dry activated carbon vessel works as a guard bed, protecting the engine oil and downstream membranes from residual sulphur peaks during feedstock changes.
The platform is standardised from 500 to 5000 m3 working volume, so one design language covers a small farm unit and a district scale plant. Clients can start with one 1500 m3 digester and add a second module, a second feeding line or an upgrading skid later without interrupting the running plant, keeping capex aligned with the actual manure volume.
More than 60 bolted digesters built on this panel system are running on livestock farms in Asia, the Middle East and South America, and clients can inspect operating references before confirming an order. Each plant is handed over with a monitoring panel that logs gas flow, digester temperature, pH and desulfurization pressure, allowing our engineers to review performance and advise on feeding adjustments remotely.
Scope covers process design, structural layout, fabrication, site erection supervision, inoculation, gradual feeding ramp up and operator training, followed by spare parts supply and remote troubleshooting. Typical delivery is 60 to 90 days after deposit, with T/T, L/C or D/P accepted.