1 MW Agricultural Biogas Plant EPC Contract For Livestock Manure Digesters

Basic Properties
Place of Origin: Qingdao, China
Brand Name: Hanwei
Certification: ISO 9001
Trading Properties
Minimum Order Quantity: 1 Project
Price: Get Custom Quote
Payment Terms: T/T,D/P,L/C
Supply Ability: 2 Projects per Quarter
Specifications
Gas Output: About 1,100 Nm3/h At 55% CH4 Retention Time: 75 To 90 Days Hydraulic
Digester Volume: 2 X 3,500 M3 CSTR Tanks Annual Running Hours: 8,000 Hours At 96% Availability
Installed Capacity: 1 MW Electrical, About 1,150 KW Thermal Feedstock Basis: 120 T/day Cattle Manure Plus 18 T/day Maize Silage
High Light:

Agricultural Biogas Plant EPC

,

1 MW Biogas Plant EPC

Product Description
Fixed Capacity, Fixed Scope

This contract is written around a 1 MW electrical output, which means the digester volume, feed mix, gas holder and CHP size are all locked to one number instead of left open for later negotiation. For a buyer comparing EPC offers, that makes the price per installed kW directly comparable.

Capacity Definition
  • Electrical output: 1 MW at the generator terminals, about 1,150 kW thermal recovered
  • Digester volume: two 3,500 m3 CSTR tanks, each with its own agitator set
  • Gas production: about 1,100 Nm3/h at 55 percent methane
  • Feed basis: 120 t/day cattle manure plus 18 t/day maize silage
  • Availability: 8,000 running hours per year at 96 percent technical availability
Scope Included

Feasibility study and mass balance, process and civil design, two digestion tanks with insulation and heating, double membrane gas holder, feed dosing and macerator, desulfurization, CHP unit with heat recovery, digestate separation, electrical and control works, installation supervision, commissioning and operator training. Grid connection works and the grid operator fee are listed as a separate line so the client sees exactly what sits outside the EPC fence.

Guarantee Structure

The contract carries a gas yield guarantee expressed as Nm3 of methane per ton of volatile solids, tested over a 30-day acceptance run on the agreed feedstock recipe. Electrical output, parasitic load and digestate quality are measured in the same window. If the guarantee is missed, the shortfall is corrected at our cost before final acceptance.

Schedule

Design and permitting run in months one to three, tank fabrication three to six, site works and erection six to ten, commissioning in months ten to twelve. Milestone payments follow the same sequence, which keeps financing needs predictable for the client.

Why This Size

1 MW is the sweet spot for agricultural plants: large enough for heat recovery to pay back, small enough to permit on a farm site and to run with a small operating team.

Send us your manure volume and silage availability, and we will confirm the 1 MW basis or size the next step up or down.