Turnkey Covered Composting EPC Package For Municipal Organic Waste Recycling

Basic Properties
Place of Origin: Qingdao, China
Brand Name: Hanwei
Certification: ISO 9001
Trading Properties
Minimum Order Quantity: 1 Project
Price: Get Custom Quote
Payment Terms: T/T,D/P,L/C
Supply Ability: 3 Projects per Quarter
Specifications
Civil Work Option: Precast Concrete Bunker Or Steel Frame Methane Avoided: Up To 60% Versus Windrow
Commissioning Period: 45 Days After Equipment Arrival Layout Basis: Modular 4-bay Blocks, Expandable In Phases
Compost Maturity: Germination Index Above 85% Final Moisture: 30-35%
High Light:

Covered Composting EPC Package

,

Turnkey Covered Composting

,

Organic Waste Composting System

Product Description
Scope of the Package

This is a full EPC offer rather than an equipment list. We start from the waste analysis and site plan, size the bunkers and aeration, supply the covered composting equipment, supervise installation, and stay on site until the first batch reaches maturity. One contract covers process, mechanical and commissioning responsibility.

What Is Included
  • Process design: mass balance, bunker sizing, retention time, air demand
  • Layout drawings for civil work, drainage and access roads
  • Membrane covers, aeration floor, blowers, control system, fastening sets
  • Installation supervision with a resident engineer during assembly
  • Commissioning, operator training and a written operating manual
Output Quality

The plant is tuned for a finished compost with germination index above 85% and moisture at 30-35%, which is the range buyers of municipal compost accept for landscaping and agriculture. Batch records from the control cabinet document temperature history, so the sanitation curve can be shown to the environmental authority during acceptance.

Environmental Case

Sealing the pile under a membrane and controlling aeration keeps the process aerobic, which suppresses methane formation. Compared with open windrow practice on the same tonnage, projects typically report up to 60% methane avoided and 90% to 99% reduction in ammonia and hydrogen sulphide emissions at the fence line. Both figures support the carbon and odour sections of a project approval file.

Schedule Logic

Design and permitting run in parallel with fabrication. Equipment ships in phases matched to site readiness, and commissioning takes about 45 days after arrival. A four-bay block is the standard first phase; a second block is added later without interrupting the running line.

Who This Fits

Municipal solid waste sorting residues, market and kitchen waste, green waste, and mixed organic streams from district collection. For private operators, the same package is offered with an operation and maintenance option for the first year.

Acceptance and Documentation

Acceptance is tied to measurable points: tonnage processed per day, pile temperature curve, final moisture, germination index and fence line odour reading. We prepare the test protocol before commissioning so both sides agree on the criteria early. Handover includes as-built drawings, spare parts list, operator manual and the batch record template.

Send us your waste composition and target tonnage, and we will prepare a phased EPC proposal with a commissioning plan.