PLC Controlled Membrane Covered Composting Systems With IoT Remote Monitoring Cabinet
| Blower Power: | 7.5 KW | HMI Size: | 10 Inch Touch Panel |
| Temperature Range: | 50 C To 75 C | Enclosure Rating: | IP54 |
| Logging Interval: | 10 Minutes | Remote Connectivity: | 4G IoT Gateway |
| High Light: | Membrane Covered Composting Systems,PLC Controlled Covered Composting Systems |
||
This version of the covered composting system puts the fermentation process under automatic supervision. A PLC with a 10 inch HMI panel reads temperature, oxygen and moisture from probes inside the pile, then adjusts the blower through a variable frequency drive to hold the target oxygen band. Operators set the batch profile once; the cabinet repeats it every day.
- Runs aeration in timed or sensor-triggered mode, selectable per batch
- Holds pile temperature between 50 C and 75 C by modulating air volume
- Logs probe data every ten minutes for twelve months and exports CSV
- Triggers audible and remote alarms on over-temperature, blower fault or sensor loss
- Supports manual override with a physical switch for maintenance work
A 4G IoT gateway publishes batch status to a cloud dashboard, so a farm manager can check temperature curves from a phone. Where the site has no cellular coverage, the same gateway runs on a local network and reports to an on-site PC. Alarm messages can be forwarded by SMS or email to up to five recipients.
Automation removes the two most labour-intensive habits of conventional composting: manual turning and hourly thermometer checks. One operator per shift is enough to load and discharge, and no turning machine or dedicated driver is needed. Most sites report a labour reduction of 60% to 70% against windrow practice.
The cabinet is IP54 rated with a powder coated steel enclosure and forced ventilation. Sensor cables are shielded and run in galvanised conduit. Where ambient temperature drops below -10 C, the enclosure is supplied with an anti-condensation heater. Spare probe and fuse kits ship with each unit.
The PLC exposes dry contacts for plant-wide SCADA, and Modbus RTU registers are documented for third-party integration. This matters for municipal plants that must report operating data to a central control room.
Before shipment the cabinet is wired, powered up and tested against a simulated probe set, so commissioning on site is a matter of connecting field cables and running one reference batch. Our engineer attends the first batch in person or guides the local team by video, whichever the client prefers, and the batch profile is then saved as a template for future cycles.
Tell us your site conditions and reporting requirements, and we will configure the control scope for your project.