50 Tons Per Day Membrane Covered Aerobic Composting System For Livestock Manure
| Daily Processing Capacity: | 50 T/day Fresh Manure | Power Consumption: | 16 - 20 KWh Per Ton Of Feed |
| Aeration Blower Power: | 7.5 KW | Bunker Configuration: | 6 Bays X 70 M3, 3-day Loading Rotation |
| Fermentation Cycle: | 15 - 18 Days Per Batch | Plant Footprint: | 1,200 M2 Including Curing Area |
| High Light: | Covered Aerobic Composting System,Membrane Aerobic Composting System |
||
This 50 tons per day covered aerobic composting line is built for cattle, swine and poultry operations that need a continuous, weather-independent manure treatment workflow. Fresh manure is loaded into an aerated static bunker, sealed under an ePTFE nano membrane cover, and stabilised by thermophilic microbes within 15 to 18 days. Because the pile is never turned, the plant runs on one loader cycle per day instead of a full turning shift.
- Rated throughput: 50 t/day of fresh manure at around 65% moisture
- Bunker layout: 6 bays of 70 m3 with a 3-day loading rotation
- Annual output: about 7,500 t of matured compost at 30-35% moisture
- Footprint: 1,200 m2 including loading apron and curing area
- Expansion: add 2 bays per 15 t/day increment without touching the blower room
Throughput is protected by three design choices. First, the positive pressure floor pipe delivers air evenly across the full bunker, so no cold corner stalls the batch. Second, batch rotation is staggered by loading day, which means one bay is always discharging while two are fermenting. Third, the membrane cover keeps internal temperature between 50 C and 75 C in rain, snow or wind, so the cycle length does not drift with the season.
Power use sits between 16 and 20 kWh per ton of feed, dominated by the 7.5 kW blower. Loading and discharge require one wheel loader and two operators per shift. Typical mass reduction is 45% to 55%, and moisture drops from roughly 65% to 30-35% without forced drying.
The line handles dairy and beef manure, layer and broiler litter, and mixed straw bedding. Where manure arrives with high sand content, we supply a heavier duty floor grating and a wider discharge channel. For farms below 30 t/day, the same design is supplied in a 3-bay version.
Supply includes membrane covers, aeration floor pipes, blowers, support frames, fastening accessories, the control cabinet, and a commissioning manual. Foundation drawings are issued after the site survey so civil work can start in parallel with production.
Share your daily tonnage and manure type, and we will return a bunker layout and power budget for your site.