800M3 Double Membrane Gas Holder PVDF Membrane Replacement Kit Stainless Clamping Rings
| Fabric Weight: | 1100 G/m2 | Membrane Material: | PVDF Coated Polyester |
| Holder Capacity: | 800 M3 | Clamping Ring Material: | Stainless 304 |
| Kit Content: | Inner Membrane, Outer Membrane, Gaskets, Fittings | Lead Time: | 10 Days Ex Works |
| High Light: | 800M3 Double Membrane Gas Holder,PVDF Double Membrane Gas Holder |
||
Product Overview
This kit is the wearing part package for an 800 m3 double membrane gas holder already in service. It contains a new inner membrane, a new outer membrane, sectional stainless clamping rings, gaskets and small fittings, all cut and welded to the holder drawing so the replacement matches the existing rim without field modification.
What Is Included
- Inner and outer membrane in 1100 g/m2 PVDF coated polyester, hot air welded and spark tested.
- Sectional 304 stainless clamping rings with bolts, so the old ring can be replaced at the same time if it has corroded.
- Gaskets and small fittings for the relief valves and blower connection.
- Installation drawing and torque table in a waterproof sleeve for the site crew.
Why Keep a Spare Set
Membrane damage from hail, sharp tools or a blower fault can take a plant offline within hours. A spare kit held on site, or a ten day ex works lead time, turns a month long shutdown into a two day membrane change and protects the gas supply contract.
Applications
- Scheduled membrane replacement at end of service life
- Emergency spares held by plant operators
- Service companies maintaining several holders in a region
Technical Summary
| Parameter | Value |
|---|---|
| Suitable holder | 800 m3, other sizes on request |
| Kit content | Inner and outer membrane, rings, gaskets |
| Fabric | PVDF coated polyester 1100 g/m2 |
| Lead time | 10 days ex works |
| Warranty | 5 years on fabric |