Integrated Biogas Gas Holder 800M3 Desulfurization Tower Interface Gas Storage
| Gas Storage Volume: | 800 M3 | Tower Interface: | DN150 Inlet, DN150 Outlet Flanges |
| Membrane Fabric: | H2S Resistant PVDF Coated Polyester | Condensate Drain: | DN50 Low Point Drain With Trap |
| Support Air: | 1.5 KW Explosion Proof Blower | Design Life: | 15 Years |
| High Light: | Integrated Biogas Gas Holder,Biogas Gas Holder 800M3 |
||
Product Overview
This 800 m3 integrated biogas holder mounts directly on the digester roof and arrives with a DN150 desulfurization tower interface already prepared in the factory. The gas leaves the holder, passes the desulfurization stage and returns to the gas train without a separate ground level vessel and its associated pipework.
Gas Treatment Interface
- DN150 inlet and outlet flanges sized for a single tower handling 150 to 300 m3 per hour of raw biogas.
- Condensate drain with trap at the low point, so water carried over from the digester does not collect in the membrane.
- Sampling port upstream and downstream of the tower for H2S readings used to schedule media changes.
- H2S resistant fabric that keeps its tensile strength in gas containing 2000 to 5000 ppm sulphide.
Packaging the Whole Gas Train
Buying the holder and treatment interface as one item removes the coordination risk between two suppliers, shortens commissioning and leaves a single warranty contact. The interface is pressure tested with the holder before shipment.
Applications
- Farm and industrial digesters with on site desulfurization
- Biogas plants feeding CHP units with strict H2S limits
- Retrofit projects adding treatment to an existing digester roof
Technical Summary
| Parameter | Value |
|---|---|
| Storage volume | 800 m3 |
| Treatment interface | DN150 in and out, sampling ports |
| Fabric | H2S resistant PVDF |
| Condensate | DN50 drain with trap |
| Design life | 15 years |