Insulated Double Membrane Gas Holder Bolted Steel Tanks For Anaerobic Digester
| Tank Volume: | 200-8,000 M3 | Diameter: | 4-30 M |
| Height: | 3-18 M | Plate Thickness: | 3-12 Mm |
| Coating Thickness: | 200-300 Um Enamel Or 180 Um Epoxy | Insulation Thickness: | 50-100 Mm PIR |
| High Light: | Double Membrane Bolted Steel Tanks,Anaerobic Digester Bolted Steel Tanks,Insulated Gas Holder Tank |
||
This insulated double-membrane gas holder bolted steel tank is a purpose-built anaerobic digester vessel in which gas storage, temperature retention and liquid containment are engineered as one unit instead of three separate structures. Factory-enamelled steel panels are bolted on site around a 50 to 100 mm polyisocyanurate insulation jacket, and a dual-layer membrane roof is mounted directly on the tank shell to buffer biogas production peaks. The arrangement removes the need for a standalone gasholder, shortens the gas train, and keeps the digester in the mesophilic range with noticeably less heating energy.
The vessel is aimed at projects where digester temperature swings, gas pressure stability and future service access decide whether a plant runs at design output. Panel geometry is calculated for wind and snow loads at the installation site, and every mechanical joint is sealed with an EPDM gasket plus flexible mastic so that the shell behaves as both a water barrier and a gas barrier.
Key Features
Roof-mounted double-membrane gas holder: an inner gas membrane and an outer weather membrane are held in shape by a small support-air blower, giving 200 to 3,000 m3 of buffer storage at 2 to 8 mbar working pressure. Gas production peaks are absorbed on the roof instead of being flared, and the outer membrane keeps rain, snow and UV away from the gas layer.
Integrated thermal insulation jacket: rigid PIR boards are clamped between the tank shell and an outer cladding ring, cutting shell heat loss substantially and helping the digester hold 35 to 38 degrees C through cold nights. Less heating demand means more net biogas available for the CHP unit.
Triple-seal leak protection: each panel lap carries an EPDM gasket, a bead of flexible sealant and torque-controlled bolts. Every tank is hydro-tested for 24 hours and air-tested before handover, so seepage and odour complaints at the flange line are designed out rather than patched later.
Service access without shutdown: a walkable roof ring, external ladder with fall arrest rail, 600 mm manway, inspection hatches, plus level, temperature and pressure gauge tappings allow routine inspection and desludging while the plant keeps running. Maintenance visits drop to a visual check and fastener torque audit once a year.
Fast modular delivery: panels, insulation and membrane parts ship in standard containers and are erected above ground with the inverted method; typical site assembly runs in a fraction of the time needed for a cast-in-place concrete digester, and weather delays are minimal.
Long-life enamel surface: glass-fused-to-steel enamel is fired onto the plate at high temperature to form an inert vitreous layer that resists hydrogen sulphide, organic acids and digestate attack, with an epoxy-coated variant offered for budget-constrained projects.
Warranty and spares programme: a 15-year structural and coating warranty is supported by a wearing-parts kit of gaskets, sealant, bolts and membrane fittings so that operators are not hunting for single-source components years later.
Technical Specifications| Parameter | Specification |
|---|---|
| Tank Volume | 200 to 8,000 m3 (custom volume on request) |
| Diameter / Height | Diameter 4 to 30 m, height 3 to 18 m |
| Steel Plate Thickness | 3 to 12 mm carbon steel, S355 or Q235B equivalent |
| Coating System | Glass-fused-to-steel enamel 200 to 300 micrometre, or epoxy 180 micrometre |
| Gas Holder Capacity | Double membrane, 200 to 3,000 m3, working pressure 2 to 8 mbar |
| Insulation | 50 to 100 mm PIR board between shell and cladding |
| Sealing | EPDM gasket plus flexible mastic, torque-controlled bolts |
| Design Temperature | Minus 30 to 60 degrees C, mesophilic and thermophilic operation |
| Design Life | 30 years and above under normal digestate service |
| Reference Standards | AWWA D103 panel design, EN 12255 wastewater plants, ISO 9001 manufacturing |
The tank fits mesophilic and thermophilic anaerobic digestion of cattle and pig slurry, poultry litter, food waste, market waste and the organic fraction of municipal solid waste, where gas output fluctuates through the day. It is also used for sewage sludge digestion at municipal plants, landfill leachate equalisation, and industrial effluent buffering at dairies, distilleries and food processing sites. Because gas storage sits on the roof, plants with a tight site boundary can keep the flare stack close and skip a separate gasholder foundation.


Panels are bundled by shell course in wooden cradles, insulation boards and membrane sheets are packed in moisture-barrier film, and all fasteners and sealant arrive in a labelled accessory crate so site teams can match parts to the erection drawing without guesswork. Incoming plate is checked for coating thickness and holiday testing before bolting; finished tanks receive dimensional checks, a 24-hour hydro test and an air-tightness test. Documentation includes material certificates, coating test reports, erection drawings and a commissioning checklist, and remote installation guidance is provided for overseas projects. Spare gaskets, sealant and fasteners for two years of service are included in the shipment.