Biogas residue + straw auxiliary materials + composting inoculant → mixing and stirring → material spreading and pile forming → laying aeration pipelines at the pile bottom → full coverage of the pile with PTFE breathable membrane → PLC variable-frequency intermittent micro-pressure aeration → high-temperature aerobic fermentation (20–25 days, 55–70°C) → membrane removal and natural curing for
15–30 days → screening → finished organic fertilizer
Supporting sideline: leachate from the composting area + site flushing water →collection ditch → collection tank → recirculation for ingredient mixing reuse;
trace condensate from the pile flows back into the pile for nitrogen retention,
with no odor emission
List of Key Supporting Equipment
Mixing and stirring machine → loader / spreading machine → aeration fan unit →PLC intelligent control cabinet → aeration pipelines → breathable